Work assignment no. 2

On 03.06.2023, in beautiful sunshine, our hardworking club members met on our club grounds in Diekholzen for work.
The storage hut needed urgent repair work on the roof overhang. To our chagrin, it had already partially rotted away. Just like the roof overhang at the toilets. After a lot of hard work, the roofs are now tight again. At the same time, the stair handrail at another corner of our club grounds was renewed and relocated. Now we have direct access to our new herb bed.
The upper and lower forest terraces and the back stairs were properly cleaned and swept.
Working together makes you hungry. So we took a well deserved break at lunch time.

Thank you very much for your hard work.
Thanks to a generous donation from Katrin Breitmeyer we were able to buy the material for this work. Thank you very much for that.